|
SHIVGANGA DRILLERS LIMITED
An ISO 9001; 14001 & 45001 certified Company
CIN:U351115MP2005PTC022112
|
| S.No | TYPE OF BOP | PRESSURE TEST DERATION & TIME | REMARKS | |||
|---|---|---|---|---|---|---|
| LOW PRESSURE (PSI) |
MINUTES | HIGH PRESSURE (PSI) |
MINUTES | |||
| 1 | ANNULAR BOP | |||||
| 2 | UPPER PIPE RAM (SIZE) | |||||
| 3 | LOWER PIPE RAM (SIZE) | |||||
| 4 | BLIND RAM / SHEAR RAM | |||||
| 5 | CHOKE MANIFOLD | |||||
| 6 | KILL MANIFOLD | |||||
| 7 | HYD. VALVE ON CHOKE LINE | |||||
| 8 | HYD. VALVE ON KILL LINE | |||||
| 9 | HP VALVES ON CHOKE & KILL MANIFOLD | |||||
| 10 | UPPER KELLY COCK | |||||
| 11 | LOWER KELLY COCK | |||||
| 12 | FOSV | |||||
| 13 | INSIDE BOP | |||||