SHIVGANGA DRILLERS LIMITED

CRITICAL EQUIPMENTS REPORT

Rig:
Date: {InspectionDate}
S.No Items Available Any Deficiency
1 Fire Pump
2 Ambulance & Ambulance Driver
3 Portable Gas Detectors
4 Fixed Gas Detection System At Rig Site
5 Rescue Stretcher
6 Choke And Kill Line
7 Emergency Power Shut-Down At Driller Console, PCR, TP Office Outside
8 Fire Hydrant System
9 Hand Rails of stair, Mud Tank etc
10 All PPE are for their intended use
11 Top Man Emergency Escape Device
12 Well Pad fencing
13 Hydraulic Brake
14 Emergency Siren system
15 Twin Saver Function And Tested
16 Emergency Speaker System (PAGA)
17 BOP Control Operating
18 Weight Indicator
19 Aviation Light
20 High Pressure lines secured by secondary line – Mud Pump to Goose Neck
Remarks / Comments:
Assistant Driller:
Safety Officer:
Tool Pusher: