SHIVGANGA DRILLERS LIMITED
Drop Survey Checklist
Doc: SGD/QHSE/F/1/49
Rig No: 
Well No. 
Date: 
Location: 
Sl. Checklist Item Check
(Yes/No)
Remarks
1 All loose tools, parts, and consumables are securely fastened at height
2 Secondary retention applied to overhead equipment (e.g., light fittings, sheaves, cameras)
3 Platforms, monkey boards, and mast free of unsecured materials or debris
4 Hand tools used at height are secured with tool lanyards
5 Dropped object barriers or physical restraints installed on overhead shelves or racks
6 Checklist verification of all fasteners (nuts, bolts, cleats) before rig-up begins
7 All materials in derrick/loft area stored in containers or properly bundled
8 Exclusion zones clearly marked and enforced beneath overhead activity areas
9 Guy lines, cables, and cat lines do not pose risk of tripping or swinging objects overhead
10 Visual inspection of derrick crown block, sheave pins, and mast components for looseness
11 Periodic checklists in place for mast crown, BOP platform, substructure and stabbing board
12 Lifting tools like elevators, bails, and handling equipment inspected for secure connections
13 Safety nets or drop mats installed where practical below high-activity zones
14 Personnel trained in dropped object awareness and tool handling at height
15 Materials being hoisted are properly slung, tagged, and controlled
16 Communication protocols (radio/hand signal) in place for overhead lifts
17 Rig floor and cellar area cleared of obstacles that could be hit by falling objects
18 Pre-use inspection log maintained for all equipment working above 1.8 meters
19 BOP stack, wellhead, and critical installations protected from falling tools/objects
20 Tag lines used and no hands under suspended loads policy enforced
Designation Name Signature
Surveyor  
HSE Officer  
DS/TP