SHIVGANGA DRILLERS LIMITED
REV PAGE
01 1 of 1
SGD/QHSE/F/1/50
WELL SITE EXIT INSPECTION
General Information
1 Area/ Field Name:
2 Rig Site Name:
3 Name of assessor:
4 Date of the rig operations exited the site:
Site Inspection
Questions Yes No Provide Details
5 Well Is Secured. X-MAS Tree is installed and pressure tested as per standard.
6 Has the location been cleared of all equipment?
7 Has the location been cleared of all waste?
8 Has the cellar been emptied?
9 Is the weather (rain) affecting well site and waste pit conditions?
10 Was the Waste and Water pits left at condition to desired satisfaction?
Please detail any other additional information or hazards not covered above (attach copies of reports as applicable):
Report Approval
DS/TP Name:
Customer Representative Name:
Signature:
Signature:
Date:
Date:
Issue No. 1
Revision No. 1 (13.02.2025)
Doc: SGD/QHSE/F/1/50